
M Noval Pajri
About Candidate
Experience as a QA/QC Engineer in Factory & Data Center Building
Location
Education
My name is M. Noval Pajri, a graduate with a Bachelor’s degree in Mechanical Engineering from Universitas Pertamina, with a strong interest in the HVAC (Heating, Ventilation, and Air Conditioning) field. For my thesis, I researched the use of coconut oil as a Phase Change Material for thermal management in residential buildings. My study, titled "Predicting Cooling Load and Energy Consumption of Coconut Oil as Phase Change Material for Thermal Management in a Residential Building using Artificial Neural Network," involved developing a predictive model based on Artificial Neural Networks (ANN) to estimate cooling load and energy consumption. I had the opportunity to present my research as a speaker at the International Conference on Sustainable Energy Engineering and Application (ICSEEA) 2024, where I shared insights on my research topic.
Work & Experience
1. Quality Control Project, EDGE DATA CENTER, (Oct 2023-Dec2023) • Inspect the installation and system of MEP&HVAC • Check Quality of Material Equipment
1. Quality Control Project, Mayora Indah Tbk, PT. Dellifood Sentosa Corpindio, Plant Jayanti 3 (Dec 2023-Feb 2024) • Inspect the installation and system of MEP&HVAC • Check Quality of Material Equipment 2. Quality Control Project, Mayora Indah Tbk, Plant Purwosari, (Feb 2024-Jul2024) • Inspect the installation and system of MEP&HVAC • Check Quality of Material Equipment
1. Quality Control Project, GDS DATA CENTER, (Jul 2024-Now) . Learning and understanding: Technical Specifications, Shop Drawing, Material/Equipment (has been approved by the Consultant/MK/Owner), work methods, measuring tools used (have been calibrated and valid), and minutes of Aanwijzing/Clarification. • Ensuring the quality of materials that arrive in the field and which will be installed according to standards to pass the inspection. • Ensure and control/ monitoring in the field from fabrication to installation, as well as testing the installation results by implementation quality of work at the project site following the Inspection and Test Plan (ITP) • Review and control all the inspection checklist report and creat confirmation to the construction team (Project Manager/ Site Manager) to determine repair/replacement if needed. • Collect installed installation data, test results and certificates (if required) to perform level 2 commissioning, and Accompany level 3 and 4 commissioning testing and ensure that the quality of work is good.